Concrete Calculator

Concrete volume = length × width × thickness (in) ÷ 12 ÷ 27 cubic yards. A 10 × 10 ft patio 4 in thick holds 33.3 cu ft, or 1.23 cu yd. With 10% extra that is 36.7 cu ft: 62 bags of 80 lb mix at 0.6 cu ft each, or a 1.5 yard truck order.

Units
Your result will appear here.

Running out of concrete halfway through a pour leaves a cold joint and a weak spot, so the order needs to be right before the truck arrives or the bags are stacked. This calculator handles rectangular slabs, pads, sidewalks and footings and converts the volume to cubic yards, cubic meters and bag counts.

The formula

Cubic feet = length × width × (thickness in inches ÷ 12) × number of pours

Cubic yards = cubic feet ÷ 27

Bags = ⌈cubic feet × (1 + waste %) ÷ bag yield⌉

Coverage and yield assumptions

Bag yields follow published figures for standard mixes such as Quikrete: an 80 lb bag ≈ 0.60 cu ft, a 60 lb bag ≈ 0.45 cu ft and a 40 lb bag ≈ 0.30 cu ft. One cubic yard is 27 cu ft, so it takes about 45 bags of 80 lb mix per yard. Ready-mix plants sell by the cubic yard, often in quarter-yard steps with a minimum order or short-load fee.

How thick should the slab be?

Four inches is standard for patios, walkways and shed floors. Driveways for passenger cars are commonly 4–5 in and 6 in for heavier vehicles or poor soils. Thickened edges and footings are deeper; follow your plans and local code. The Portland Cement Association recommends a well-compacted, uniform subgrade, which matters more for long-term cracking than extra thickness.

Base, forms and reinforcement

Most slabs sit on 4 in or more of compacted gravel. Set forms with 2× lumber staked every few feet and check them for level or the slope you want (about 1/8 to 1/4 in per foot away from buildings). Wire mesh, rebar or fiber reinforcement controls crack width; it does not prevent cracks. Cut or tool control joints at spacing about 2–3 times the slab thickness in feet (for a 4 in slab, roughly every 8–12 ft) to a depth of one quarter of the thickness.

Bags or ready-mix?

Mixing 40–60 bags by hand or with a rented mixer is a long, hard day for two people. Above about one cubic yard, a ready-mix truck or a short-load supplier usually saves money and gives better, more consistent concrete. For a truck, measure the actual depth of your forms at several points, since an extra half inch over a large area adds up quickly.

Curing

Common mistakes to avoid

Waste factor

Add 5–10% for spillage, uneven subgrade and form deflection. Use 10% for DIY bag pours and uneven ground, and 5% for carefully screeded subgrade with a truck order. Ordering short is far more costly than leaving a few bags over.

Imperial and metric

Switch the toggle above the inputs to enter ft ↔ m, in ↔ cm. The page converts metric entries to imperial before calculating, using NIST factors (1 ft = 0.3048 m, 1 in = 2.54 cm), and shows key results in both systems.

Worked examples

Patio 10 × 10 ft, 4 in

Inputs: length 10 ft; width 10 ft; thickness 4 in; how many identical pours 1; waste factor 10%.

Result: You need 1.36 cubic yards of concrete (1.04 m³).

Driveway apron 20 × 12 ft, 5 in

Inputs: length 20 ft; width 12 ft; thickness 5 in; how many identical pours 1; waste factor 5%; cost per unit $6.5.

Result: You need 3.89 cubic yards of concrete (2.97 m³).

Six footings 2 × 2 ft, 12 in

Inputs: length 2 ft; width 2 ft; thickness 12 in; how many identical pours 6; waste factor 10%.

Result: You need 0.98 cubic yards of concrete (0.75 m³).

Quick reference for common sizes

The table repeats the first worked example at smaller and larger sizes, keeping every other setting the same, so you can see how the concrete calculator result scales.

InputsResult
length 5.0 ft; width 5.0 ft; thickness 4 in; how many identical pours 1; waste factor 10%You need 0.34 cubic yards of concrete (0.26 m³)
length 7.5 ft; width 7.5 ft; thickness 4 in; how many identical pours 1; waste factor 10%You need 0.76 cubic yards of concrete (0.58 m³)
length 15.0 ft; width 15.0 ft; thickness 4 in; how many identical pours 1; waste factor 10%You need 3.06 cubic yards of concrete (2.34 m³)
length 20 ft; width 20 ft; thickness 4 in; how many identical pours 1; waste factor 10%You need 5.43 cubic yards of concrete (4.15 m³)
length 30 ft; width 30 ft; thickness 4 in; how many identical pours 1; waste factor 10%You need 12.22 cubic yards of concrete (9.34 m³)

Limitations

The calculator assumes rectangular shapes with uniform thickness. For round columns and post holes use the post hole calculator. Structural footings, foundations and suspended slabs must be designed to code.

Frequently asked questions

How many bags of concrete for a 10 × 10 slab?

At 4 in thick you need about 56 bags of 80 lb mix without waste, or 62 with 10% extra.

How much does a yard of concrete cover?

At 4 in thick, one cubic yard covers about 81 sq ft.

How many 80 lb bags make a yard?

About 45 bags, since each yields roughly 0.6 cu ft.

How thick should a concrete patio be?

Usually 4 in on a compacted gravel base.

Should I order extra ready-mix?

Yes, 5–10%. Running short is far more costly than a little left over.

Sources

  1. Portland Cement Association. Concrete basics and residential slab guidance. https://www.cement.org/
  2. Quikrete. Product yields (80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft, 40 lb ≈ 0.30 cu ft; Fast-Setting 50 lb ≈ 0.375 cu ft). https://www.quikrete.com/
  3. American Concrete Institute. ACI 332, Residential Code Requirements for Structural Concrete. https://www.concrete.org/
  4. OSHA. Crystalline silica (cutting concrete, block, brick and pavers). https://www.osha.gov/silica-crystalline

Method details: how we calculate.